Optimizing mvn calls and make targets
- a separate
mvn cleancall should not be necessary (I left it in place for the setup target, in case this really make sense) -
mvn verifyincludes thecompileandpackagephases (see Maven build lifecycle below) -
generate-spectarget did point toinstall-yarnandvalidate-specwhich also pointed toinstall-yarn
Maven build lifecycle: https://maven.apache.org/guides/introduction/introduction-to-the-lifecycle.html#a-build-lifecycle-is-made-up-of-phases