Skip to content

PLCgen: failure of the test `op_bind_and_prio_numX` for S7-400

The tests op_bind_and_prio_numX (with X being 1, 2 or 3) are a part of the self-certification test for PLCgen. During the self-certification test for the target S7-400 those three test failed. The simulator has detected a System Fault (SF). The question is: why?

afbeelding.png

Addresses #679, #1019 (closed)

Edited by Dennis Hendriks