-
Robert Smith authored
The VisItPlotViewer had previously always been using the VizResource for the last plot added, preventing it from redrawing old plots. It now keeps track of all used resources and will switch to the resource matching the selected VizEntry before trying to draw the plot. Signed-off-by: Robert Smith <SmithRW@ornl.gov>
5ec93743